Twiques:

The Art of Home Comfort

Text Box: Before in the Bathroom

During:

The floor was rotten from water damage and so was ripped out when tile was being replaced.

Before:  Bathroom needed a face lift ~ during demo found additional repairs were needed.

Above: New studs, cement board and subfloor laid after damage removed.

Below: New flooring in place.